Third Tacoma Narrows Suspension Bridge - Under Construction

This is an image set within the Bridgemeister collection.

Bridge:Third Tacoma Narrows Suspension Bridge - Under Construction
Location:Tacoma and Gig Harbor, Washington, USA - Puget Sound
Coordinates and Maps:See related inventory record(s).
Image Set Contributor:Patrick S. O'Donnell
Related Suspension Bridge Inventory:2007 Third Tacoma Narrows - Tacoma and Gig Harbor, Washington, USA
Related Image Lists:All from Patrick S. O'Donnell
All in Washington
All in USA
All Vehicular Suspension Bridges
Credit:All photos by Patrick S. O'Donnell. Please do not reuse without permission.

Patrick writes: "My second visit to the new bridge under construction - just 10 months after the first. The ship containing the first 16 deck sections had been in the area for 6 weeks prior to my arrival. They started lifting deck sections the first week after my return home - two weeks after these shots. Originally the hanging of the deck sections were to commence in April, but wire issues for the main cable pushed it back to early June. The ship arrived in early June, but several issues made it that it would be two months until the first deck section is lifted. First issue was the ship couldn't fit under the existing Tacoma Narrows Bridge. Another issue was the winches on the ship were sabotaged by somebody throwing 'handfuls of nuts and bolt' into the mechanisms."

powatacoma3a-1.jpg

powatacoma3a-2.jpg

powatacoma3a-3.jpg

powatacoma3a-4.jpg

powatacoma3a-5.jpg

powatacoma3a-6.jpg

powatacoma3a-7.jpg

"I've been to Seattle four times previously. This fifth time was the first where I could see Mt Rainier."

powatacoma3a-8.jpg

powatacoma3a-9.jpg

powatacoma3a-10.jpg

powatacoma3a-11.jpg

powatacoma3a-12.jpg

powatacoma3a-13.jpg

powatacoma3a-14.jpg

powatacoma3a-15.jpg

powatacoma3a-16.jpg

powatacoma3a-17.jpg

powatacoma3a-18.jpg

powatacoma3a-19.jpg

powatacoma3a-20.jpg

"For the ladies. This guy was just pacing back and forth like a caged bear. Probably was getting tired of waiting for weeks. He's barely visible in the two previous photos."

powatacoma3a-21.jpg

powatacoma3a-22.jpg

powatacoma3a-23.jpg

powatacoma3a-24.jpg

powatacoma3a-25.jpg

powatacoma3a-26.jpg

"Somebody was already doing donuts up on the new deck sections prior to hanging them! These same pictures show that this deck section is to be lifted exactly at mid-span. The fixtures on each side of the deck are where the deck will be connected to the main cable. They're unique and not visible on any of the other sections."

powatacoma3a-27.jpg

powatacoma3a-28.jpg

powatacoma3a-29.jpg

powatacoma3a-30.jpg

powatacoma3a-31.jpg

powatacoma3a-32.jpg

"Gradual zoom in of workers up on the catwalk."

powatacoma3a-33.jpg

powatacoma3a-34.jpg

powatacoma3a-35.jpg

powatacoma3a-36.jpg

powatacoma3a-37.jpg

powatacoma3a-38.jpg